Mount Benson Project — Trail Work

–submitted by Matthew Lettington

The Mount Benson Project continues to roll along. During the summer, we spent our time diverting water and shoring up the eroding bank. Since then, we have been reluctant to do any work that relies on the integrity of the work previously done. When the fall rains arrived, we examined the results of the work, and it appears that most of the water is being diverted off the trail. Though there is still more work to be done in this area, we are ready to move into some other areas of work.

Dustin, using the hammer drill to create a socket for rebar.

On Wednesday, October 30, Dustin and Matthew loaded their backpacks and set out with adhesive, rebar, and hammer drill do work that added steps in a few key places within our section.

Continue reading “Mount Benson Project — Trail Work”

Mount Benson Project –July 6 Work Party

July 6th was going to be a busy day for our work party. There were 8 volunteers signed up but as the forecast worsened the cancellations started arriving. By the time we hit the trail, there were three souls that braved the misty conditions to do a day’s work on the trail.

For the day we focussed on installing an extra step in the eroding bank, stabilizing the bank by installing extra width on one of the steps, hauling more debris into the off route sections, and trimming wood obstacles that could hook a hiker’s foot. A big part of the project is doing sustainable work that withstand the test of time, and that means controling the flow of water. Much of the trail erosion has been made worse by the waterfall that forms on the trail and flows down a large portion of our section.

Continue reading “Mount Benson Project –July 6 Work Party”

Mount Benson Project Work Party –Eroding Bank

On June 1st, a five-member crew hiked spent a little over five hours on the Mount Benson Project. We scheduled a short day to allow for members to join in the club BBQ, later that day. 

With a seemingly endless amount of work to be done the crew focused first on moving materials from the lower road to the eroding bank. Once positioned we spent the remainder of the day working at the eroding bank. 

After watching a few groups walk through the site we picked a route that is now the one route up through this section.

Before Pictures

The start of the day, this eroding slop sees traffic going every which way.

Continue reading “Mount Benson Project Work Party –Eroding Bank”

Mount Benson Trail Project — Area Survey

On Saturday, March 30th a small group of Ramblers and guests took a few hours to hike the Mount Benson trail. Our goal was to survey the area that we are designated to work in, describe the type of work that needs to be done, and examine what the winter rage has wrought.

Happily, the snow has receded, revealing the ground and making it easy to see the work we still need to do. The work falls into four categories, requiring three different types of skills to complete.
On Saturday, March 30th a small group of Ramblers and guests took a few hours to hike the Mount Benson trail. Our goal was to survey the area that we are designated to work in, describe the type of work that needs to be done, and look at what the winter has wrought.

Continue reading “Mount Benson Trail Project — Area Survey”