–submitted by Matthew Lettington
The Mount Benson Project continues to roll along. During the summer, we spent our time diverting water and shoring up the eroding bank. Since then, we have been reluctant to do any work that relies on the integrity of the work previously done. When the fall rains arrived, we examined the results of the work, and it appears that most of the water is being diverted off the trail. Though there is still more work to be done in this area, we are ready to move into some other areas of work.
On Wednesday, October 30, Dustin and Matthew loaded their backpacks and set out with adhesive, rebar, and hammer drill do work that added steps in a few key places within our section.